The idea is to erase the border between the river and the ground, so that there is no clear distinction between the two. Proposal is developed from components with varied properties obtained through triangular subdivision of the given lot. Resulting pattern is the used to develop flexible occupancy scenarios and introduce infrastructural strategy. Finally, as the third iteration of the pattern, known planing parameter were introduced to help control of the formal growth.



![08091[P]_Vladan_Stevovic_9_Hand_made_model](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_9_Hand_made_model.jpg)
![08091[P]_Vladan_Stevovic_10_Novi pravci kretanja](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_10_Novi-pravci-kretanja.jpg)
![08091[P]_Vladan_Stevovic_4_Connecting_modules](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_4_Connecting_modules.jpg)
![08091[P]_Vladan_Stevovic_7_Rule_of_sorting](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_7_Rule_of_sorting.jpg)
![08091[P]_Vladan_Stevovic_5_One_possible_combination](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_5_One_possible_combination.jpg)
![08091[P]_Vladan_Stevovic_10_Hand_made_model](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_10_Hand_made_model.jpg)
![08091[P]_Vladan_Stevovic_39_prostorni model](http://blog.4ofseven.com/wp-content/uploads/2010/08/08091P_Vladan_Stevovic_39_prostorni-model.jpg)